Home
|
About us
|
Oversize Cargos
|
Normal Cargos
|
Services
|
News
|
Contact us
SERVICES
Multimodal transport for project cargos
Load in/ Load out heavy structures
Project Management
Transport oversize cargos by roadway and seaway
Move and install railway and roadway bridge components
Install heavy equipment and structures by skidding and lifting system
Provide services of lifting and installation of equipment by gantry and tower crane
Implement logistics services globally
Provide logistics and transportation services by seaway
Provide consulting services and research of feasible plan for transporting, loading/ unloading and installation of equipment
Normal Cargos
ONLINE SUPPORT
WEBSITE STATISTICS
Online
:
2
Hit counter
:
534953
OVERSIZE CARGOS
THE PHUONG MAI 3 WIND FARM PROJECT
In September 2021, HTL performed Mechanical and Electrical Installation of 06 wind turbines provided by Siemens Gamesa for Phuong Mai 3 wind power project in Cat Tien commune, Phu Cat district, Binh Dinh province.
The workers worked hard in the harsh weather with heat from the sun and wind from sand dunes and with no tree shade... Photo: T1 bottom tower is being installed.
The installation location is on sand dunes and it is a big obstacle in transporting equipment and moving the crane to the base of the turbine pillar - Photo: Equipment storage yard.
OTHER OVERSIZE CARGOS
62 TURBINES OF THE BAC LIEU WIND FARM- PHASE I & II HAVE BEEN SUCCESSFULLY COMPLETED
HTL INSTALLED SUCCESSFULLY TURBINES FOR THE BAC LIEU WIND FARM-PHASE II
HTL TRANSPORT, LOAD OUT/ LOAD IN KOCKS CRANE AND RTG CRANE FOR CAT LAI NEW PORT
TRANSPORT OVERSIZE, OVERWEIGHT CARGOS FOR AMMONIUM NITRATE PLANT
COMPLETED CONSTRUCTION & INSTALLATION OF THE BAC LIEU WIND FARM - PHASE I
THE BAC LIEU WIND FARM
TRANSPORT 600MT CRAWLER CRANE
TRANSPORT DATANO MOBILE CRANE
TRANSPORT EQUIPMENT FOR DONG NAI 4 HYDRO POWER PLANT
Back
|
Next
Home
|
About us
|
Oversize Cargos
|
Normal Cargos
|
Services
|
News
|
Contact us