ONLINE SUPPORT
My status
WEBSITE STATISTICS
Online : 1
Hit counter : 135757
ABOUT US
INTRODUCTION
introducitonOverview:
Huy Hoang Transportation & Logistics Corporation (HTL) was established in 2010. Its main function is to provide transportation services for normal cargos and oversize cargos by different means of transportation such as roadway, seaway, riverway for national and international projects and customers; Construct - transport and install Wind power and Solar projects nationwide

Registered head-office
340/44 Ung Van Khiem Street, Ward 25, Binh Thanh district, HCMC, Vietnam
Tel : 028.3512 5999 (3 lines)   - Fax: 028.3512 5009 Business License
No.: 0310448024 issued by Ho Chi Minh City’s Department of Planning and Investment

The Board of Directors:

Chairman and Director: Nguyen Van Trung - 43 years of experience and expertise in the field of transporting, loading/ unloading oversize cargos and handling wind power - solar projects.

Our services:
As to human resources, HTL is proud to have an experienced team of officers, engineers (Mechanic, Electric, Naval, Civil ...), workers, drivers who have years of experiences in the field of transporting, loading/ unloading normal cargos and oversize cargos.
As to equipment, HTL has a fleet of Freighliner 430HP tractor, Heavy Huyndai 440HP prime mover, 45' container trailers, low bed trailers and different types of hydraulic trailers with multi-axles for transporting oversize cargos, containers and packaged components for plants, factories and projects.

HTL could handle a wide range of works starting from technical engineering design, making plan to managing the implementation of transportation, loading/ unloading projects by different means of transportation in the fields of electricity, petroleum, transport, manufacturing industry ... We have participated in below typical projects and construction works:
+ Joint-name with another contractor for transporting all normal cargos for Dong Nai 4 Hydro Power Plant (~ 4,500 tons).
+ Joint-name with TRANACO in successful moving 02 container cranes of 550T at Cat Lai Port for Sai Gon New Port (Cty Tan Cang Sai Gon).
+ Transport hundreds of Super-T bridge beam of L38m x W 1,8m x 1,65m, 80T/ each for Vinaconex Saigon Joint Stock Company.
+ Transport by riverway and roadway more than 12,500 ton of concrete piles for PVShipyard of 0,7m x D20m diameter, weight of 12T from HCMC to Vung Tau.
+ Transport lots of mobile cranes with weight varying from 50T-80T for PTSC and other customers S.R. Vietnam.
+ Transport 10 Diesel Generator of 220T/ each and 2,000T of other equipment for Cuu Long Steel Company - HyundaiVinashin in Nha Trang by combining roadway and waterway.
+ Transport lots of normal and oversize cargos for many customers in nationwide such as: Thu Duc Electro-Mechanical Joint Stock Company – Ban A Miền Nam – Power Transmission Company No. 04 ...

+ Transport 04 stator packages weighing 118 tons and 02 transformer packages weighing 140tons from HCM port storage yard to the jobsite for Dong Nai 4 Hydro power plant in Dak Nong province.

+ Transport 22 oversize & overweight packages on barge and specialized trailers for Thai Binh Amon Nitrat plant.

+ Reposition 03 Kocks cranes from yard to port and load in - load out 02 KE cranes and 04 RTG cranes from Cat Lai port to Hiep Phuoc port for Tan Cang company.

+ Transport equipment of normal size and oversize with total quantity over 1,600 tons for Dak Mi 2 Hydropower plant.

+ Construct 25 turbine foundations, domestic transport and install 62 wind turbines for the Bac Lieu Wind Farm- phase 1 & 2, Bac Lieu province.

+ Leasing 600 tons crawler crane and workers for Binh Phuoc cement plant.

+ Domestic transport and install 12 wind turbines for the Phu Lac Wind Farm- phase 1, Binh Thuan province.

+ Design, construct, transport 3 sets of wind turbines and mechanical intall 03 sets of wind turbines for the Dam Nai Wind Farm - phase 1, Ninh Thuan province.

+ Install 16 wind turbines for the Mui Dinh Wind Farm- phase 1, Ninh Thuan province